Job Details
Post Name : Trade Apprentice
No of Vacancy : 750 Posts
Pay Scale : Rs 7982/- (Per Month)
Trade Wise Vacancy :
Electrician : 155 Posts
Fitter : 217 Posts
Machinist Composite : 102 Posts
Welder (Gas and Electric) : 108 Posts
Turner : 53 Posts
Computer (COPA/PASAA) : 36 Posts
Draftsman(Mechanic) : 15 Posts
Electronic(Mechanic) : 15 Posts
Mechanic Motor Vehicle : 17 Posts
Machinist Grinder : 10 posts
Mason : 05 Posts
Painter(General) : 07 Posts
Carpenter : 04 Posts
Plumber : 08 Posts
Educational Qualification : 10th Pass and ITI with Minimum 60% Marks(55% for SC/ST) in related Trade
Age Limit : Minimum and Maximum age limit is 14 to 25 years as on 3103.
2018
Job Location : Bhopal (Madhya Pradesh)
Selection Process : Selection will be based on Merit Basis / Interview
Application Fee : There is no application fee
How to Apply : Interested candidates may apply through the website wwwbhelpssrco.
in from 04012018 to 03022018 & send the Acknowledgment Slip Along with Copies of Registration Number, Birth Certificate or 10th Marksheet, Qualification Certificates, ITI Certificate/Marksheet, Domicile Certificate, AAdhar Card, Caste Certificate to Below Address.
Post Box No 35, Post Office Piplani, BHEL,Bhopal Pin Code – 462022(Madhya Pradesh) on or before 10022018
BHELs growth has been synchronous with achieving self-sufficiency in the indigenous manufacturing of heavy electrical equipment.
Out of the available 35,000 MW per annum capacity for power plant equipment manufacturing in the country, BHEL alone constitutes a mammoth 20,000 MW per annum capacity A widespread network of 17 Manufacturing Divisions, 2 Repair Units, 4 Regional Offices, 8 Service Centres, 4 Overseas Offices, 6 Joint Ventures, 15 Regional Marketing Centres and current project execution at more than 150 project sites across India and abroad corroborates the humungous scale and size of its operations
In FY 2016-17, the company commissioned/synchronized 8,539 MW of power generating equipment With this, the company’s global installed power generating capacity has gone up to 178 GW Notably, enhanced focus on project execution has resulted in BHEL achieving a capacity addition of 45,274 MW during the 12th Five Year Plan period (2012-17), surpassing the target of 41,661 MW set by the government for BHEL, by 9%.
With this, BHEL continues to remain the single largest contributor to the country’s power generation capacity addition